Refinery Waste Treatment:

Cleanup Compliant

and Oil Recovery Efficient

Iron Creek Group’s TecZero™ Units provide indirect thermal desorption to delist hazardous waste and recover higher-grade oils through a safe, effective refinery waste treatment process.

High-Efficiency Equipment for

Refinery Sludge and

Maximum Hydrocarbon Recovery

Iron Creek Group’s revolutionary TecZero™  and Enhanced Thermal Conduction (ETC) systems are effective solutions for treating refinery waste in a single-step, double-output process:

● Refinery sludge is indirectly heated in the TecZero™ bin, and the released vapors are captured and used to fuel the treatment process.

● Outputs, including high-grade oil and safe, sterile solids, can be safely recycled.

Exceeds

Environmental and Cost

Efficiency Standards

Through intelligent design and proven success, our state-of-the-art technologies surpass traditional waste remediation methods.

  • On-Site Ex-Situ Treatment: Ensures a smaller carbon footprint and lower costs than conventional dig-and-dump methods.

  • Rapid Treatment With Zero Reject Waste: Saves cleanup costs and prevents future liability.

  • Closed-Loop Waste Processing: Delist hazardous waste, recover higher-grade oils, and recycle safe, usable by-products from the refinery waste treatment process.

Designed for Real-World Refinery Operations

Submit An Inquiry

Serving North America, Iron Creek Group is an innovative thermal soil remediation company that specializes in the treatment of organic waste. The group specializes in developing advanced technologies that are proven, predictable, and cost effective. Learn how they’re leveraging technology to deliver safer and more effective remediation solutions by visiting their newsroom.

For inquiries, please contact Ken Bell: ken@ironcreekgroup.com.

thermal bin with piping

Frequently

Asked Questions

  • Our systems are nimble and portable and can typically be deployed and operational within days, depending on site conditions. This process makes treatment much quicker than traditional remediation and dig-and-dump methods.

  • Our ETC mobile systems are agile enough to fit within the belly of an airplane. The TecZero™ bins are compact and nimble for shipping or trucking. Once set up, these thermal remediation treatment cells can scale to the size required to safely and effectively treat contaminated land.

  • In-situ methods require penetrating the soil with a thermal probe, potentially hitting subsurface layers and mixed contaminants that complicate the process. Our technology is ex-situ based, which is more reliable, effective, and affordable.

  • Our technology can fit into small urban spaces and scale large areas of land. It has treated contaminated superfund sites, brownfields, legacy oil fields, and more.

  • Yes, we designed our contaminated soil treatment process to eliminate landfill dependency, with a predictable process resulting in zero reject waste.

  • Yes, as long as the soil is impacted with organic contaminants, our technology can handle a range of materials without pretreatment.

  • Yes, we design all of our technology to meet or exceed the strictest environmental protocols.

Safety is Our Number One Priority

Our technology is designed to meet the most rigorous regulatory standards because we understand the biggest liability to site remediation is human health and safety. Our stringent protocols protect human and environmental health, and ensure an incident-free job site. 

Experts in Superfund Site Remediation