  • 2,000 tons of impacted soil
  • Diesel range organic contamination (up to 22,000 mg/kg)
  • Soil type: gravel to tight clay with high moisture content
  • Very limited infrastructure was onsite

Project Operations

  • Portable Quonset hut covers constructed for transport
  • ETC gear hand loaded onto deHavilland Twin Otter Aircraft
  • LPG supplied from multi-tank arrays
  • Treatment during extended periods of severe weather and heavy rain

Planned Customer Results

  • The treatment was successfully completed in four weeks
  • Post Treatment analysis confirmed all samples met Yukon CSR guidelines for hydrocarbons