Project Details
- 2,000 tons of impacted soil
- Diesel range organic contamination (up to 22,000 mg/kg)
- Soil type: gravel to tight clay with high moisture content
- Very limited infrastructure was onsite
Project Operations
- Portable Quonset hut covers constructed for transport
- ETC gear hand loaded onto deHavilland Twin Otter Aircraft
- LPG supplied from multi-tank arrays
- Treatment during extended periods of severe weather and heavy rain
Planned Customer Results
- The treatment was successfully completed in four weeks
- Post Treatment analysis confirmed all samples met Yukon CSR guidelines for hydrocarbons
- Liability was removed and closure was achieved at the site