Illinois, United States

Project Details

2,325.79 Tons of soil was treated. Soil was contaminated with M-55 stab detonators, hydrocarbons, and explosives residues.

Project Operations

Project duration was about 1 month (November 7th to December 6th).  ETC Technology was utilized.

Planned Customer Results

All laboratory analytical results were below laboratory detection limits (basically non-detect).  Project completed with 100% safety record.