PFAS Remediation Projects

Our technologies are proven to eliminate 99% of PFAS chemicals from soils and sludges.

Iron Creek & Jacobs Pilot Project

  • Conducted with Jacobs and Battelle
  • Tested highly concentrated PFAS-impacted soil
  • Achieved greater than 99.9% removal at high temperature
  • 99.4% removal of 29 PFAS at 350°C

DoD PFAS Pilot

  • Full-scale TecZero™ field demonstration
  • Targeted greater than 99% PFAS reduction
  • Evaluated soil and off-gas destruction
  • Achieved elimination of measurable PFAS mass