Iron Creek Group's Thermal Technology Remediates Petroleum-Impacted Land
Iron Creek Group’s Enhanced Thermal Conduction (ETC) and TecZero™ deliver petroleum-impacted soil remediation on-site using advanced thermal desorption technology to remove hydrocarbons and restore soil health.
What Are the Challenges of Petroleum-Impacted Soil Remediation?
Landfarming and landfill disposal have long been the default approaches to managing petroleum-impacted soil. But neither eliminates the liability of the contamination.
Landfarming requires significant land to spread petroleum-impacted soil across a treatment area and relies on biological degradation over time. Temperature, moisture, soil characteristics, and hydrocarbon concentrations affect it, making the time needed to reach cleanup targets difficult to predict. Landfarming may also involve site-specific regulatory requirements that add operational constraints or limit where and how treatment can be conducted. For sites with high hydrocarbon concentrations, biological degradation may be too slow to meet cleanup targets within the required timeframe.
Transporting hazardous material to landfills increases risk and takes time, requiring permitting and chain-of-custody documentation. Hauling costs, tipping fees, and the need to source and truck in clean backfill all add to the total project cost. Once material leaves the site, the generating facility may still retain liability for how the material is ultimately managed.
For sites with legacy petroleum contamination, particularly refinery waste and former industrial land, these limitations are well understood. On-site thermal treatment offers a better approach for sites where conventional treatment or disposal presents limitations.
How Does Thermal Treatment Remediate Petroleum-Impacted Soil?
Iron Creek Group’s Enhanced Thermal Conduction (ETC) and TecZero™ are both ex-situ thermal treatment systems, meaning contaminated material is excavated and treated in a controlled, on-site system. The technologies differ in the types of material they each are designed to treat.
What is the Difference Between ETC and TecZero™?
ETC is designed for drier petroleum-impacted soil, including material from landfarming sites, brownfields, and other sites where hydrocarbons have accumulated in the soil over time. Contaminated soil is stacked over heating elements and enclosed in an airtight treatment cell. Indirect heat drives off hydrocarbon contaminants without direct flame contact. Captured vapors are routed to an afterburner for destruction or recovered for reuse, including as fuel for the treatment process.
TecZero™ is designed for wetter petroleum waste streams, including refinery tank bottom sludge, saturated hydrocarbon waste, and other high-moisture materials that are not suited to ETC’s stacking process. TecZero™ processes this material in a self-contained, modular bin structure without the need for pre-screening or dewatering. Using indirect heat in a low-oxygen environment, the system vaporizes hydrocarbons and routes off-gases for destruction or recovery. Recovered hydrocarbons can be reused to help power the system, reducing fuel consumption and operating costs.
Both systems have no moving parts and can typically be operational within a few days of arriving on-site.
How Does ETC Remediate Petroleum-Contaminated Soil?

The Marwell Tar Pit in Whitehorse, Yukon, is among the most documented examples of ETC technology applied to legacy petroleum contamination at scale.
The site originated as a World War II-era refinery built to process crude oil transported via the Canol Pipeline from Norman Wells, Northwest Territories. After closing in the late 1940s, refinery waste tar was deposited in a pit on the site, which eventually became an informal dump. By the 1990s, hydrocarbons and free tar product had been identified in the groundwater, and contamination had migrated offsite into local streams. The site remained contaminated for more than 70 years before remediation began.

Iron Creek Group, in partnership with Milestone Environmental Contracting, deployed ETC technology to treat the site for the Yukon Government. The project involved approximately 36,000 tons of heavily impacted soil containing petroleum hydrocarbons and PAH impacts, all exceeding Yukon Contaminated Site Regulations thresholds. Treatment proceeded through all seasons in Whitehorse, including their extreme winters. The compact technology can be transported by truck or ship and is even sized to fit in the belly of a cargo aircraft, allowing it to reach challenging and remote sites.

ETC treatment produced soil results well below the original site-specific cleanup targets. Post-treatment testing confirmed that the treated soil met the Yukon CSR Commercial/Industrial limits. The 70-year-old contamination site was addressed in 11 months, and on-site treatment kept approximately 1,000 truckloads of contaminated soil off public roads and out of landfills. Iron Creek Group and Milestone Environmental received the Canadian Brownfields Network Brownie Award for excellence in brownfield remediation for the Marwell project.
What Are the Benefits of On-Site Petroleum-Impacted Soil Remediation?
The operational difference between on-site thermal treatment and conventional disposal is most evident in how liability is handled after the project closes.
When treated material meets applicable EPA and state or territorial regulatory standards, it can be delisted, or reclassified as non-hazardous waste. That reclassification changes the downstream requirements. Permitting burden decreases, transportation documentation changes, and disposal costs drop. For facilities managing recurring petroleum waste streams, the savings compound across projects.
While thermal treatment may not necessarily eliminate landfilling entirely when treating tank-bottom sludge, reducing the volume of material requiring disposal can significantly reduce transportation and disposal requirements, and treated material may qualify for a different waste classification when applicable regulatory criteria are met.
For refinery operators specifically, on-site treatment also reduces dependence on off-site disposal capacity, a practical consideration as hazardous waste landfill space becomes increasingly constrained and disposal costs continue to rise.
Which Petroleum Remediation Approach Is Right for Your Site?
Petroleum contamination varies by material, concentration, moisture content, and site conditions, so the appropriate remediation approach depends on what needs to be treated. Iron Creek Group can evaluate the site and determine whether ETC, TecZero™, or both are appropriate for the project.
From petroleum-impacted soil to refinery tank bottom sludge, Iron Creek Group’s thermal treatment systems can treat contaminated material on-site while recovering hydrocarbons and reducing the volume of material requiring disposal.
Watch our YouTube video where Chad and Roger from our executive team discuss the Marwell Tar Pit remediation project.
Frequently Asked Questions About Petroleum-Impacted Soil Remediation
Can ETC and TecZero™ be used together on the same site?
Sites with both dry petroleum-impacted soil and wet sludge can be treated using ETC for the drier material and TecZero™ for saturated waste or tank sludge. The systems are independent and modular, and a site assessment will determine the appropriate configuration.
Does thermal treatment work in cold climates and remote locations?
Iron Creek Group’s systems are designed for year-round operation, including at cold-climate and remote sites. The Marwell Tar Pit project in Whitehorse, Yukon, ran through all seasons and is a documented example of ETC performing effectively under those types of extreme conditions.
What contaminants can ETC treat besides petroleum hydrocarbons?
ETC is designed to treat a range of organic contaminants, including petroleum hydrocarbons (LEPH and HEPH), PAHs, PFAS, VOCs, and explosives (TNT/RDX). The specific treatment approach depends on the compounds present and their concentrations.
How does hydrocarbon recovery factor into the treatment process?
As soil or sludge is heated, the system captures vaporized hydrocarbons rather than releasing them. Depending on the application, those hydrocarbons can be routed to an afterburner for destruction or recovered for reuse, including to help fuel the treatment system.
What does the remediation process look like from mobilization to project close?
Iron Creek Group conducts an initial site assessment to evaluate contaminant type, soil conditions, and volume, to help determine the appropriate technology or combination of technologies. Equipment is mobilized to the site, typically operational within days of arrival, and treatment proceeds in defined cells or bins. Treated material is tested against applicable regulatory standards. Material that meets applicable regulatory criteria may qualify for delisting and management as non-hazardous waste. Iron Creek Group documents treatment results to support the client’s regulatory closure process.
About Iron Creek Group
Iron Creek Group specializes in developing advanced, mobile remediation technology that solves complex environmental challenges across North America and beyond. Headquartered in Bellingham, Washington, with Canadian operations based in Alberta, Iron Creek Group has deployed its technologies at former refineries, Superfund sites, brownfields, legacy oil fields, and military installations, from the Arctic Circle to Antarctica. To learn more, visit ironcreekgroup.com.